FREE sourcing support and up to 3% coordination support for qualified business buyers. Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements.
Decision workspace
Use this guide with an article code, retained sample and written specification. It is not an ESG or carbon program page.
Outdoor and performance programs often change weave, knit gauge, laminate, DWR or insulation package after the first mill reply. Each revision needs a date, owner and sample identity so later quotations still match the approved construction.
| Decision | Evidence to request | Boundary |
|---|---|---|
| State the material question before choosing an option | Article and version-specific record of construction, GSM, usable width and finish chemistry still open. | Confirm in writing which question blocks sampling. |
| Compare evidence using the same reference | Lab dip, strike-off or batt sample tied to the same method and retained swatch. | Confirm in writing that a new finish does not reuse an old sample ID. |
| Record the next decision in the RFQ message | Quantity, destination and which revision the mill must quote. | Confirm in writing before a second mill is added to the comparison. |
Accepting an alternative without a revision log mixes loft, hydrostatic results and shade. If a mill substitutes a different denier or coating, mark the change against the original construction. This page does not invent a measured keyword; it supports purchase decisions already reviewed for this site.
A practical revision board lists construction (weave, knit gauge, laminate stack), finish code, GSM target and tolerance, usable width, sample ID, date and owner. When a lab dip is approved, the strike-off and the bulk dye lot still need their own lines. When a DWR is changed, hydrostatic pressure and moisture vapor transmission should be re-checked on the new finish rather than inherited from the previous version. Insulation package revisions should record grams, batt structure and whether the shell article also changed. Put the current version number into the RFQ message so two mills are not quoting two different boards. SelvedgeHaven Procurement can coordinate those versions; the buyer still decides which revision is purchasable.
Limits of this workspace: a revision log is not a test report; tensile strength, tear strength, pilling, dye lot continuity and AQL remain mill- or lab-owned. Ask each mill to name method, edition and specimen condition instead of copying a brochure class. Stock lots can move faster when the construction already matches; custom development can match fiber composition and finish but will not pass until roll inspection and documents attach to that article. SelvedgeHaven Procurement does not run a hydrostatic laboratory, does not certify OEKO-TEX STANDARD 100, and does not publish mill capacity. Use the RFQ to record which checks are in scope and which remain unknown.
Share construction notes, finish codes, sample IDs and the decision still open so quotations follow the latest version.
Send a fabric briefQualified business buyers may receive FREE matching and initial quote support, with up to 3% coordination support after review. Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements.